search Filter Category All Sitio altamente erosionable Alaska Arid Climate Biotic Earth Biotic Earth Canada Clay Soils Clima árido Endmiendas Bioticas Enmienda Biotica Environmentally Protected Site Erosion Control Blankets Especies invasivas Estados Unidos High heat conditions High Visibility Site Highly Erodible Site Invasive Species Latin America Limited Access Little Organic Matter Livestock Low Budget Malas Hierbas Manitoba Manta hidraulica minería Mining Minnesota Native Seeds No supplemental watering Northern Climate Ontario pendientes pronunciadas Poca materia orgánica Previous Vegetation Failed Previously failed revegetation Quebec Quick Vegetation Required Reclamation recuperación Remote Site Residential restauración Restoration Sandy Soil semillas nativas Shaded slopes Significant Rain Event Sitio protegido sitio remoto Slopes of 3:1 or greater Steep Slopes suelo arenoso Suelos Pobres Texas Tierras aridas TRMs UK USA vegetación rápida requerida Vegetation required for project close out Washington Waterway Wattles/Stenlogs Wildlife Issue Search River Avenue Condominium Shoreline Restoration Winnipeg, MB An area along the shoreline of the Assiniboine River was eroding due to water level changes and wave action from boats. The engineer (KGS Group) designed a riprap toe to reinforce the lower shoreline and had originally specified four inches of imported topsoil and sod for the upper section. After the initial design, hydraulic options were considered as alternatives due to limited access. View More Sunset Farms Landfill - Manor, TX Previous attempts to revegetate using a fully synthetic TRM (Turf Reinforcement Mat) on other areas of the Sunset Farms Landfill in Manor, TX (just outside of Austin) had not reached satisfactory density vegetation for Republic Services. View More Line 2E Terra Nova Case Study: Terra Nova, ON With extreme cut inclines (1:1 and steeper), the Line 2E Road project, near Terra Nova, in Southern Ontario, was quite challenging. View More
River Avenue Condominium Shoreline Restoration Winnipeg, MB An area along the shoreline of the Assiniboine River was eroding due to water level changes and wave action from boats. The engineer (KGS Group) designed a riprap toe to reinforce the lower shoreline and had originally specified four inches of imported topsoil and sod for the upper section. After the initial design, hydraulic options were considered as alternatives due to limited access. View More
Sunset Farms Landfill - Manor, TX Previous attempts to revegetate using a fully synthetic TRM (Turf Reinforcement Mat) on other areas of the Sunset Farms Landfill in Manor, TX (just outside of Austin) had not reached satisfactory density vegetation for Republic Services. View More
Line 2E Terra Nova Case Study: Terra Nova, ON With extreme cut inclines (1:1 and steeper), the Line 2E Road project, near Terra Nova, in Southern Ontario, was quite challenging. View More