Since a plan had not been in place for preserving the topsoil , the soil on the site was lacking the nutrients needed for successful plant growth and sustainability. Willows were dotted around th site, but struggled due to the poor quality soil. PennDOT had seeded the area three times with inadequate results. The Engineering Architecture Design Services (EADS) Group asked Triton Environmental of Pittsburgh, PA for assistance.