Previous attempts at erosion control and vegetation establishment had failed on tower footings at the Baffin Windfarm south of the city of Sarita in Kenedy County Texas. Hot, dry conditions, low soil fertility, and
additional issue of the wind farm being an active cattle ranch combined to make clear why previous attempts at revegetation had been unsuccessful. Due to entanglement risk, the property owner also dictated no erosion control blankets with netting could be used – all erosion control must be hydraulically applied. A special blend of of seed was required due to grazing activity.